[2021-New] PRINCE2-Exams PRINCE2-Foundation Dumps With Update Exam Questions (41-50)

Q1. - (Topic 1) What is an off-specification? A. A new requirement B. A quality tolerance C. A type of issue D. A major risk View AnswerAnswer: C Q2. - (Topic 2) Which is a true statement about PRINCE2 event-driven controls? A. Event-driven controls take place at predefined periodic intervals B. Event-driven controls are produced at the frequency defined in a Work Package C. Event-dr


[2021-New] PRINCE2-Exams PRINCE2-Foundation Dumps With Update Exam Questions (21-30)

Q1. - (Topic 2) Which is a purpose of the Risk theme? A. Establish a method for the implementation of continuous improvement during the project B. Identify, assess and control problems that have occurred C. Provide the Project Board with a time-driven control to capture all project risks D. Establish a cost-effective procedure to identify, assess and control risks View AnswerAnswer: D Q2.


[2021-New] PRINCE2-Exams PRINCE2-Foundation Dumps With Update Exam Questions (1-10)

Q1. - (Topic 1) Which of the following statements about the Project Initiation Documentation are true? 1. The Project Initiation Documentation is used to ensure that a sound basis exists before the Project Board authorizes a project. 2. The Project Initiation Documentation should be updated at the end of each stage to reflect the current status of a project. A. Only 1 is true B. Only 2 is